Eurodime has been commissioned to produce mixed aluminium and stainless steel joints for a nuclear power plant. These critical components, with diameters ranging from DN 400 to 900 mm, must withstand high pressures and meet strict quality and safety requirements.

Each component requires meticulous work, paying particular attention to welding conditions, ambient temperatures and the constraints associated with final radiographic testing. This project illustrates Eurodime’s ability to work with precision and consistency in an environment where quality is not an option.

Jonction Aluminium Inox

Finesse / Patience / Consistency

Three words about the project – Mr Clément Godon, workshop manager

The expertise of the Eurodime Group

This mixed joint project drew on the experience and precision of our most skilled welders, who are capable of working on complex parts with an impeccable finish.

Our teams ensured:

  • Aluminium/stainless steel welding under highly controlled thermal conditions.
  • Compliance with the dimensional and pressure constraints specific to the nuclear sector.
  • The preparation and dispatch of parts for radiographic testing, carried out externally to guarantee compliance.

Each stage was followed with rigour and patience in order to produce parts that are solid, reliable and certified.

A demanding environment, precision work

In the nuclear industry, quality is an absolute requirement. This project was carried out with:

  • Rigorous management of welding conditions, adjusting the temperature according to the season to avoid any deformation.
  • Enhanced verification procedures, with systematic radiography of welds.
  • Continuous attention to the smallest details, as even the slightest error can compromise the safety of the system.

This project has mis en lumière la patience et la régularité nécessaires à ce type d’intervention, où l’expertise humaine fait toute la différence.

Conclusion

The production of aluminium-stainless steel joints for a nuclear power plant illustrates Eurodime’s cutting-edge expertise in the most sensitive industrial environments.

Thanks to the skill of our welders, our ability to adapt and our well-managed organisation, we were able to deliver parts that comply with the most stringent standards. This project reflects our commitment to quality, safety and performance, while highlighting the precision work carried out with finesse and rigour by our teams.